1 | Blake Manor Road | 2011 Bond Program | Travis County | Project Rescue and Completion | Widen Blake Manor Rd from 2-lane to 4-lane from Taylor Lane to the proposed Wildhorse Connector (close to the Manor City Limits) |
2 | Cameron Rd (Construction) | 2011 Bond Program | Travis County | Project Rescue and Completion | Widen and realign the existing 2-lane road to a 4-lane divided arterial with bike lanes and sidewalks from Gregg Lane to SH 130. |
3 | E. William Cannon Drive - Phase 3 | 2011 Bond Program | Travis County | Project Rescue and Completion | New 4-lane arterial from McKinney Falls Parkway to US 183 -Broken down into Three Phase- Phase 1 and phase 2 construction complete |
4 | Taylor Lane (Construction) | 2011 Bond Program | Travis County | Project Rescue and Completion | Widen 2-lane road to 4-lane arterial from Braker Lane extension to Blake Manor Road |
5 | Arkansas Bend Park Phase II | 2017 Bond Program | Travis County | Program Management Consultant | Construct overnight facilities and associated site improvements |
6 | Bee Creek Sports Complex Development | 2017 Bond Program | Travis County | Program Management Consultant | Build a sports complex with synthetic turf fields, sports lighting, hiking, biking, and walking trail, picnic areas, playgrounds, and other site improvements. |
7 | Bitting School Rd @ unamed trib to Wilbarger Creek | 2017 Bond Program | Travis County | Program Management Consultant | Drainage structure to replace existing culverts |
8 | Bullick Hollow Road @ FM2769 Intersection Improvements | 2017 Bond Program | Travis County | Program Management Consultant | Add right turm lane on west bound Bullick Hollow Road at FM2769 |
9 | Circle Drive/Thomas Springs | 2017 Bond Program | Travis County | Program Management Consultant | SH 71 to US 290 W, add bike lanes |
10 | Conservation Easements | 2017 Bond Program | Travis County | Program Management Consultant | Execute conservation agreements to protect water resources, working farms and ranches, wildlife habitat, critical environmental features, and other natural and cultural resources |
11 | Decker Lane/ Hog Eye Road Sidewalk | 2017 Bond Program | Travis County | Program Management Consultant | Decker Lake Road to Hog Eye Road then Decker Lane to community First Village, construct sidewalk |
12 | Eastern Travis County Parkland Acquisition | 2017 Bond Program | Travis County | Program Management Consultant | Acquire parkland for the greenways, Colorado River corridor parks, and parks in the Post Oak Savanna region |
13 | Ed Acklin Rd @ unnamed trib to Dry Creek | 2017 Bond Program | Travis County | Program Management Consultant | Drainage structures to replace undersized culverts |
14 | Elroy Road | 2017 Bond Program | Travis County | Program Management Consultant | Within the right-of-way of SH130, to add sidewalk |
15 | Fitzhugh Road | 2017 Bond Program | Travis County | Program Management Consultant | US 290 W to Travis County Line, add bike lanes |
16 | FM 973 | 2017 Bond Program | Travis County | Program Management Consultant | Moore's Bridge Road to Elroy Road, add a shared use path |
17 | Gilleland Creek Greenway improvements | 2017 Bond Program | Travis County | Program Management Consultant | Plan, design, and engineer the 19-mile greenway between Northeast Metro Park and the Colorado River |
18 | Gilleland Creek Greenway Parkland Acquisition | 2017 Bond Program | Travis County | Program Management Consultant | Acquire parkland for a 19-mile Gilleland Creek greenway between Northeast Metro Park and the Colorado River |
19 | Grand Avenue Parkway | 2017 Bond Program | Travis County | Program Management Consultant | Construct new 4 lane divided roadway with bike lanes and sidewalks from Bratton Lane to Crissom Lane and add two additional lanes from Crissom Lane to 350' north of Roller Crossing |
20 | Great Divide @ Little Barton Creek (Construction Only) | 2017 Bond Program | Travis County | Program Management Consultant | Bridge to replace undersized culverts |
21 | Gregg Lane @ Wilbarger Ck | 2017 Bond Program | Travis County | Program Management Consultant | Replace undersized culvert |
22 | Harold Green Extension | 2017 Bond Program | Travis County | Program Management Consultant | Construct new 2 lane roadway with bike lanes and sidewalks from SH130 to Austins Colony Blvd |
23 | North Walnut Creek Ph IIIB | 2017 Bond Program | Travis County | Program Management Consultant | Sprinkle Road to Old Manor Road, engineering and right-of-way only for shared use path |
24 | Northeast Metro Park Soccer Field Improvements | 2017 Bond Program | Travis County | Program Management Consultant | Convert four (4) soccer fields to synthetic turf, install sports lighting, and build associated improvements |
25 | Old Lockhart Road | 2017 Bond Program | Travis County | Program Management Consultant | Slaughter Lane to Thaxton Road, add bike lanes |
26 | Old San Antonio Road | 2017 Bond Program | Travis County | Program Management Consultant | Austin City Limit to Hays County Line, add bike lanes |
27 | Onion Creek Greenway Improvements | 2017 Bond Program | Travis County | Program Management Consultant | Construct trailhead park at the US 183 and Onion Creek park site and build a hiking, biking, and walking trail to Barkley Meadows; construct restrooms, water and waste water services, and a loop trail around Barkley Meadows |
28 | Sidewalk Safety & ADA Upgrades | 2017 Bond Program | Travis County | Program Management Consultant | Construct New/Reconstruct non-compliant sidewalks |
29 | South Pleasant Valley Road | 2017 Bond Program | Travis County | Program Management Consultant | Construct new 4 lane divided roadway with bike lanes and sidewalks from FM 1327 to Bradshaw Road approximately 1,000' south of River Plantation Drive |
30 | Spicewood Springs Rd Low Water Crossing #1 Only | 2017 Bond Program | Travis County | Program Management Consultant | Bridge to replace undersized box culvert |
31 | Springdale Road Sidewalk | 2017 Bond Program | Travis County | Program Management Consultant | Ferguson Ln to US Hwy 290, construct sidewalk |
32 | Strategic Parkland Acquisitions | 2017 Bond Program | Travis County | Program Management Consultant | Acquire land or interest in land in the Pedernales River watershed to improve the boundary configuration of an existing park |
33 | Tom Sassman Rd @ Maha Ck | 2017 Bond Program | Travis County | Program Management Consultant | Bridge to replace undersized culverts |
34 | Tumbleweed Trail @ Trib to Lake Austin | 2017 Bond Program | Travis County | Program Management Consultant | Drainage structure to replace undersized culvert |
35 | TxDOT Right-of-Way | 2017 Bond Program | Travis County | Program Management Consultant | Right-of-way for State road projects |
36 | Westminster Glen Sidewalk | 2017 Bond Program | Travis County | Program Management Consultant | City Park Road to Narrow Ridge, construct sidewalk |
37 | William Cannon Extension | 2017 Bond Program | Travis County | Program Management Consultant | Engineering and ROW acquisition for a new 4 lane divided roadway with shoulders from US 183 at William Cannon to FM973 |
38 | Wyldwood Road @ Slaughter Creek and tributary | 2017 Bond Program | Travis County | Program Management Consultant | Bridges to replace undersized culverts |
39 | Hodde Lane Roadway Realignment | 2017 CO Program | Travis County | Program Management Consultant | Realign S-Curve near Mott Elementary School |
40 | Arroyo Doble/Twin Creeks | 2018 CO Program | Travis County | Program Management Consultant | Construct subdivision drainage improvements as identified in the 2009 Drainage Basin Study, and make drainage improvements to the adjacent Bethel Church Road, Polk Road, and Wirth Road. Design funds approved in FY17 CO's |
41 | Caldwell Ln @ River Timber Dr | 2018 CO Program | Travis County | Program Management Consultant | Place drainage structure at low point in road |
42 | County Line Rd @ Elm Creek | 2018 CO Program | Travis County | Program Management Consultant | Drainage structure to replace undersized culverts |
43 | Elroy Road Widening | 2018 CO Program | Travis County | Program Management Consultant | Widen the existing 2 lane roadway to a 4 lane divided roadway with bike lanes and sidewalks from McAngus Rd to Kellam Rd and bring the roadway out of the 100 year flood plain. |
44 | Great Divide @ Little Barton Creek [Eng Only] | 2018 CO Program | Travis County | Program Management Consultant | Engineering Design for bridge to replace undersized culverts |
45 | Hamilton Pool Road (acute) | 2018 CO Program | Travis County | Program Management Consultant | Concentrated safety improvements to include adding left turn lanes at 4 locations, 3 culvert extensions, shoulder improvements at 6 curves, a 3,000 foot passing lane, and one intersection alignment improvement from RM12 to the Pedernales River |
46 | Hamilton Pool Road Phase 2 | 2018 CO Program | Travis County | Program Management Consultant | Phase II - Safety Improvements along Hamilton Pool Road; Addition of shoulders, turn lanes, and increasing curve radii from 1.7 Miles East of Pedernales River to East of High Plains Drive. |
47 | Hog Eye Rd @ Harris Branch - Lockwood Watershed | 2018 CO Program | Travis County | Program Management Consultant | Drainage structure to replace undersized culverts |
48 | Hog Eye Rd @ trib to Harris Branch - Lockwood Watershed | 2018 CO Program | Travis County | Program Management Consultant | Drainage structure to replace undersized culvert |
49 | Jesse Bohls Realign** (0.5 mi in Pflugerville) [Eng / ROW] | 2018 CO Program | Travis County | Program Management Consultant | Engineering & ROW only for the realignment of Jesse Bohls at Weiss Lane to align with E. Pflugerville Pkwy as a 2 lane Roadway with shoulders from Weiss lane to approximately 1 mile east then continue with added shoulders out to Cameron Rd and new alignment approaching Cameron Rd. |
50 | Ledgestone Terrace @ Pen Crk Tributary | 2018 CO Program | Travis County | Program Management Consultant | Drainage structure to replace undersized culvert |
51 | Linden Rd @ Maha Creek | 2018 CO Program | Travis County | Program Management Consultant | Replace undersized bridge and adjacent culverts |
52 | Littig Rd #161 | 2018 CO Program | Travis County | Program Management Consultant | Rehab/replace bridge #161 |
53 | Manda Carson Rd #134 | 2018 CO Program | Travis County | Program Management Consultant | Rehab/replace bridge #134 |
54 | Old Manor Rd Safety Improvements | 2018 CO Program | Travis County | Program Management Consultant | Improve the existing 2 lane roadway and add shoulders from Ferguson Cut-off Rd to Johnny Morris Rd and add left turn lanes at major intersections |
55 | Pearce Lane Widening [Eng / ROW] | 2018 CO Program | Travis County | Program Management Consultant | Engineering & ROW only for widening the existing 2 lane roadway to a 4 lane divided roadway with bike lanes and sidewalks from Kellam Rd to the Travis/Bastrop County Line. |
56 | Pearce Ln @ Kellam Rd Intersection Improv. | 2018 CO Program | Travis County | Program Management Consultant | Add left turn lanes at approaches to intersection with Kellam Road and improve drainage structures for improved flow |
57 | Pedernales Canyon Trail @ Lick Creek | 2018 CO Program | Travis County | Program Management Consultant | Drainage structure to replace undersized culverts |
58 | Roadway Reconstruction | 2018 CO Program | Travis County | Program Management Consultant | Funding for various roadway reconstruction projects across the County |
59 | Ross Rd North (High School) | 2018 CO Program | Travis County | Program Management Consultant | Add northbound auxiliary/right turn lane from St.Thomas to northern most driveway of Del Valle HS. Add Pedestrian Signal at second driveway. |
60 | Ross Road South | 2018 CO Program | Travis County | Program Management Consultant | Widen the existing 2 lane roadway to a 4 lane divided roadway with bike lanes and sidewalks from Pearce Lane to Heine Farm Rd |
61 | Substandard Roads** | 2018 CO Program | Travis County | Program Management Consultant | Funding for cost-share agreements with subdivisions to improve unaccepted roadways to meet current county roadway standards |
62 | Thaxton Road | 2018 CO Program | Travis County | Program Management Consultant | Widen existing 2 lane roadway to a 4 lane roadway with bike lanes and sidewalks from, Mckny Falls Pky to Sassman Rd |
63 | Thomas Springs Rd at Circle Drive | 2018 CO Program | Travis County | Program Management Consultant | Add left turn lane on eastbound Circle Dr approaching Thomas Springs Rd |
64 | Wells Branch Pkwy @ Howard Ln Median Modification | 2018 CO Program | Travis County | Program Management Consultant | Add and extend left turn lanes on Wells Branch approaching Howard Lane intersection and close median opening between Howard and Loop 1 |
65 | Wells Branch Pkwy Comprehensive Study | 2018 CO Program | Travis County | Program Management Consultant | Evaluate and improve safety, roadway geometrics and signal coordination and efficiency along Wells Banch Pkwy from IH35 to Loop 1 |
66 | Bebee Road (East) | 2022 Bond Program | City of Kyle | Program and Project Controls | New location and reconstruction/widen roadway, 1.8 miles of 4-lane minor arterial from Dacy Ln to E. of Green Pastures Rd |
67 | Bebee Road (West) | 2022 Bond Program | City of Kyle | Program and Project Controls | New location and reconstruction/widen roadway, 1 mile of 4-lane minor arterial from IH35 NBFR to Dacy Lane |
68 | Bunton Creek Road | 2022 Bond Program | City of Kyle | Program and Project Controls | Reconstruction/widen existing roadway, 1.2 miles of 4 lane minor arterial from Lehman Rd to Porter Cove |
69 | Center Street (FM 150) (On-System) | 2022 Bond Program | City of Kyle | Program and Project Controls | Reconstruction/widen existing roadway, 0.4 miles of 2-3 lane minor collector from Veterans Dr to Main St |
70 | Kohlers to Seton (IH 35) | 2022 Bond Program | City of Kyle | Program and Project Controls | New location roadway, 0.13 miles of overpass or underpass from IH35 SBFR to NBFR |
71 | Kohlers to Seton (off-system) | 2022 Bond Program | City of Kyle | Program and Project Controls | New location roadway, 1.07 miles of 4-lane minor arterial and 3-lane collector from IH 35 NBFR to Seton Pkwy |
72 | Kyle Parkway/Lehman Road Extension | 2022 Bond Program | City of Kyle | Program and Project Controls | New location roadway, 1.3 miles of 4-lane minor arterial from Dacy Ln to Bunton Creek Rd |
73 | Marketplace Avenue | 2022 Bond Program | City of Kyle | Program and Project Controls | New location and reconstruction/widen roadway, 0.6 miles of 4-lane minor arterial from FM 1626 to Marketplace Ave (Existing) |
74 | Old Stagecoach Road/Center Street (Off-System) | 2022 Bond Program | City of Kyle | Program and Project Controls | Reconstruction/widen existing roadway, 2.2 miles of 4-lane minor arterial from FM 2770 to Veterans Dr |
75 | Windy Hill Road | 2022 Bond Program | City of Kyle | Program and Project Controls | Reconstruction/widen existing roadway, 0.6 miles of 4 lane minor arterial Purple Martin Ave to IH 35 NBFR |
76 | Development Process Change Management | Travis County | Development Services Improvement | Program and Project Controls | Help Travis County more quickly and effectively work through over 22,000 active permit applications with 250 – 700 new applications coming in each month. |
NO. |
PROJECT NAME |
FUNDING SOURCE |
OWNER |
COMPANY ROLE/RESPONSIBILITY |
PROJECT DESCRIPTION |
||||
1 | Blake Manor Road | 2011 Bond Program | Travis County | Project Rescue and Completion | Widen Blake Manor Rd from 2-lane to 4-lane from Taylor Lane to the proposed Wildhorse Connector (close to the Manor City Limits) | ||||
2 | Cameron Rd (Construction) | 2011 Bond Program | Travis County | Project Rescue and Completion | Widen and realign the existing 2-lane road to a 4-lane divided arterial with bike lanes and sidewalks from Gregg Lane to SH 130. | ||||
3 | E. William Cannon Drive - Phase 3 | 2011 Bond Program | Travis County | Project Rescue and Completion | New 4-lane arterial from McKinney Falls Parkway to US 183 -Broken down into Three Phase- Phase 1 and phase 2 construction complete | ||||
4 | Taylor Lane (Construction) | 2011 Bond Program | Travis County | Project Rescue and Completion | Widen 2-lane road to 4-lane arterial from Braker Lane extension to Blake Manor Road | ||||
5 | Arkansas Bend Park Phase II | 2017 Bond Program | Travis County | Program Management Consultant | Construct overnight facilities and associated site improvements | ||||
6 | Bee Creek Sports Complex Development | 2017 Bond Program | Travis County | Program Management Consultant | Build a sports complex with synthetic turf fields, sports lighting, hiking, biking, and walking trail, picnic areas, playgrounds, and other site improvements. | ||||
7 | Bitting School Rd @ unamed trib to Wilbarger Creek | 2017 Bond Program | Travis County | Program Management Consultant | Drainage structure to replace existing culverts | ||||
8 | Bullick Hollow Road @ FM2769 Intersection Improvements | 2017 Bond Program | Travis County | Program Management Consultant | Add right turm lane on west bound Bullick Hollow Road at FM2769 | ||||
9 | Circle Drive/Thomas Springs | 2017 Bond Program | Travis County | Program Management Consultant | SH 71 to US 290 W, add bike lanes | ||||
10 | Conservation Easements | 2017 Bond Program | Travis County | Program Management Consultant | Execute conservation agreements to protect water resources, working farms and ranches, wildlife habitat, critical environmental features, and other natural and cultural resources | ||||
11 | Decker Lane/ Hog Eye Road Sidewalk | 2017 Bond Program | Travis County | Program Management Consultant | Decker Lake Road to Hog Eye Road then Decker Lane to community First Village, construct sidewalk | ||||
12 | Eastern Travis County Parkland Acquisition | 2017 Bond Program | Travis County | Program Management Consultant | Acquire parkland for the greenways, Colorado River corridor parks, and parks in the Post Oak Savanna region | ||||
13 | Ed Acklin Rd @ unnamed trib to Dry Creek | 2017 Bond Program | Travis County | Program Management Consultant | Drainage structures to replace undersized culverts | ||||
14 | Elroy Road | 2017 Bond Program | Travis County | Program Management Consultant | Within the right-of-way of SH130, to add sidewalk | ||||
15 | Fitzhugh Road | 2017 Bond Program | Travis County | Program Management Consultant | US 290 W to Travis County Line, add bike lanes | ||||
16 | FM 973 | 2017 Bond Program | Travis County | Program Management Consultant | Moore's Bridge Road to Elroy Road, add a shared use path | ||||
17 | Gilleland Creek Greenway improvements | 2017 Bond Program | Travis County | Program Management Consultant | Plan, design, and engineer the 19-mile greenway between Northeast Metro Park and the Colorado River | ||||
18 | Gilleland Creek Greenway Parkland Acquisition | 2017 Bond Program | Travis County | Program Management Consultant | Acquire parkland for a 19-mile Gilleland Creek greenway between Northeast Metro Park and the Colorado River | ||||
19 | Grand Avenue Parkway | 2017 Bond Program | Travis County | Program Management Consultant | Construct new 4 lane divided roadway with bike lanes and sidewalks from Bratton Lane to Crissom Lane and add two additional lanes from Crissom Lane to 350' north of Roller Crossing | ||||
20 | Great Divide @ Little Barton Creek (Construction Only) | 2017 Bond Program | Travis County | Program Management Consultant | Bridge to replace undersized culverts | ||||
21 | Gregg Lane @ Wilbarger Ck | 2017 Bond Program | Travis County | Program Management Consultant | Replace undersized culvert | ||||
22 | Harold Green Extension | 2017 Bond Program | Travis County | Program Management Consultant | Construct new 2 lane roadway with bike lanes and sidewalks from SH130 to Austins Colony Blvd | ||||
23 | North Walnut Creek Ph IIIB | 2017 Bond Program | Travis County | Program Management Consultant | Sprinkle Road to Old Manor Road, engineering and right-of-way only for shared use path | ||||
24 | Northeast Metro Park Soccer Field Improvements | 2017 Bond Program | Travis County | Program Management Consultant | Convert four (4) soccer fields to synthetic turf, install sports lighting, and build associated improvements | ||||
25 | Old Lockhart Road | 2017 Bond Program | Travis County | Program Management Consultant | Slaughter Lane to Thaxton Road, add bike lanes | ||||
26 | Old San Antonio Road | 2017 Bond Program | Travis County | Program Management Consultant | Austin City Limit to Hays County Line, add bike lanes | ||||
27 | Onion Creek Greenway Improvements | 2017 Bond Program | Travis County | Program Management Consultant | Construct trailhead park at the US 183 and Onion Creek park site and build a hiking, biking, and walking trail to Barkley Meadows; construct restrooms, water and waste water services, and a loop trail around Barkley Meadows | ||||
28 | Sidewalk Safety & ADA Upgrades | 2017 Bond Program | Travis County | Program Management Consultant | Construct New/Reconstruct non-compliant sidewalks | ||||
29 | South Pleasant Valley Road | 2017 Bond Program | Travis County | Program Management Consultant | Construct new 4 lane divided roadway with bike lanes and sidewalks from FM 1327 to Bradshaw Road approximately 1,000' south of River Plantation Drive | ||||
30 | Spicewood Springs Rd Low Water Crossing #1 Only | 2017 Bond Program | Travis County | Program Management Consultant | Bridge to replace undersized box culvert | ||||
31 | Springdale Road Sidewalk | 2017 Bond Program | Travis County | Program Management Consultant | Ferguson Ln to US Hwy 290, construct sidewalk | ||||
32 | Strategic Parkland Acquisitions | 2017 Bond Program | Travis County | Program Management Consultant | Acquire land or interest in land in the Pedernales River watershed to improve the boundary configuration of an existing park | ||||
33 | Tom Sassman Rd @ Maha Ck | 2017 Bond Program | Travis County | Program Management Consultant | Bridge to replace undersized culverts | ||||
34 | Tumbleweed Trail @ Trib to Lake Austin | 2017 Bond Program | Travis County | Program Management Consultant | Drainage structure to replace undersized culvert | ||||
35 | TxDOT Right-of-Way | 2017 Bond Program | Travis County | Program Management Consultant | Right-of-way for State road projects | ||||
36 | Westminster Glen Sidewalk | 2017 Bond Program | Travis County | Program Management Consultant | City Park Road to Narrow Ridge, construct sidewalk | ||||
37 | William Cannon Extension | 2017 Bond Program | Travis County | Program Management Consultant | Engineering and ROW acquisition for a new 4 lane divided roadway with shoulders from US 183 at William Cannon to FM973 | ||||
38 | Wyldwood Road @ Slaughter Creek and tributary | 2017 Bond Program | Travis County | Program Management Consultant | Bridges to replace undersized culverts | ||||
39 | Hodde Lane Roadway Realignment | 2017 CO Program | Travis County | Program Management Consultant | Realign S-Curve near Mott Elementary School | ||||
40 | Arroyo Doble/Twin Creeks | 2018 CO Program | Travis County | Program Management Consultant | Construct subdivision drainage improvements as identified in the 2009 Drainage Basin Study, and make drainage improvements to the adjacent Bethel Church Road, Polk Road, and Wirth Road. Design funds approved in FY17 CO's | ||||
41 | Caldwell Ln @ River Timber Dr | 2018 CO Program | Travis County | Program Management Consultant | Place drainage structure at low point in road | ||||
42 | County Line Rd @ Elm Creek | 2018 CO Program | Travis County | Program Management Consultant | Drainage structure to replace undersized culverts | ||||
43 | Elroy Road Widening | 2018 CO Program | Travis County | Program Management Consultant | Widen the existing 2 lane roadway to a 4 lane divided roadway with bike lanes and sidewalks from McAngus Rd to Kellam Rd and bring the roadway out of the 100 year flood plain. | ||||
44 | Great Divide @ Little Barton Creek [Eng Only] | 2018 CO Program | Travis County | Program Management Consultant | Engineering Design for bridge to replace undersized culverts | ||||
45 | Hamilton Pool Road (acute) | 2018 CO Program | Travis County | Program Management Consultant | Concentrated safety improvements to include adding left turn lanes at 4 locations, 3 culvert extensions, shoulder improvements at 6 curves, a 3,000 foot passing lane, and one intersection alignment improvement from RM12 to the Pedernales River | ||||
46 | Hamilton Pool Road Phase 2 | 2018 CO Program | Travis County | Program Management Consultant | Phase II - Safety Improvements along Hamilton Pool Road; Addition of shoulders, turn lanes, and increasing curve radii from 1.7 Miles East of Pedernales River to East of High Plains Drive. | ||||
47 | Hog Eye Rd @ Harris Branch - Lockwood Watershed | 2018 CO Program | Travis County | Program Management Consultant | Drainage structure to replace undersized culverts | ||||
48 | Hog Eye Rd @ trib to Harris Branch - Lockwood Watershed | 2018 CO Program | Travis County | Program Management Consultant | Drainage structure to replace undersized culvert | ||||
49 | Jesse Bohls Realign** (0.5 mi in Pflugerville) [Eng / ROW] | 2018 CO Program | Travis County | Program Management Consultant | Engineering & ROW only for the realignment of Jesse Bohls at Weiss Lane to align with E. Pflugerville Pkwy as a 2 lane Roadway with shoulders from Weiss lane to approximately 1 mile east then continue with added shoulders out to Cameron Rd and new alignment approaching Cameron Rd. | ||||
50 | Ledgestone Terrace @ Pen Crk Tributary | 2018 CO Program | Travis County | Program Management Consultant | Drainage structure to replace undersized culvert | ||||
51 | Linden Rd @ Maha Creek | 2018 CO Program | Travis County | Program Management Consultant | Replace undersized bridge and adjacent culverts | ||||
52 | Littig Rd #161 | 2018 CO Program | Travis County | Program Management Consultant | Rehab/replace bridge #161 | ||||
53 | Manda Carson Rd #134 | 2018 CO Program | Travis County | Program Management Consultant | Rehab/replace bridge #134 | ||||
54 | Old Manor Rd Safety Improvements | 2018 CO Program | Travis County | Program Management Consultant | Improve the existing 2 lane roadway and add shoulders from Ferguson Cut-off Rd to Johnny Morris Rd and add left turn lanes at major intersections | ||||
55 | Pearce Lane Widening [Eng / ROW] | 2018 CO Program | Travis County | Program Management Consultant | Engineering & ROW only for widening the existing 2 lane roadway to a 4 lane divided roadway with bike lanes and sidewalks from Kellam Rd to the Travis/Bastrop County Line. | ||||
56 | Pearce Ln @ Kellam Rd Intersection Improv. | 2018 CO Program | Travis County | Program Management Consultant | Add left turn lanes at approaches to intersection with Kellam Road and improve drainage structures for improved flow | ||||
57 | Pedernales Canyon Trail @ Lick Creek | 2018 CO Program | Travis County | Program Management Consultant | Drainage structure to replace undersized culverts | ||||
58 | Roadway Reconstruction | 2018 CO Program | Travis County | Program Management Consultant | Funding for various roadway reconstruction projects across the County | ||||
59 | Ross Rd North (High School) | 2018 CO Program | Travis County | Program Management Consultant | Add northbound auxiliary/right turn lane from St.Thomas to northern most driveway of Del Valle HS. Add Pedestrian Signal at second driveway. | ||||
60 | Ross Road South | 2018 CO Program | Travis County | Program Management Consultant | Widen the existing 2 lane roadway to a 4 lane divided roadway with bike lanes and sidewalks from Pearce Lane to Heine Farm Rd | ||||
61 | Substandard Roads** | 2018 CO Program | Travis County | Program Management Consultant | Funding for cost-share agreements with subdivisions to improve unaccepted roadways to meet current county roadway standards | ||||
62 | Thaxton Road | 2018 CO Program | Travis County | Program Management Consultant | Widen existing 2 lane roadway to a 4 lane roadway with bike lanes and sidewalks from, Mckny Falls Pky to Sassman Rd | ||||
63 | Thomas Springs Rd at Circle Drive | 2018 CO Program | Travis County | Program Management Consultant | Add left turn lane on eastbound Circle Dr approaching Thomas Springs Rd | ||||
64 | Wells Branch Pkwy @ Howard Ln Median Modification | 2018 CO Program | Travis County | Program Management Consultant | Add and extend left turn lanes on Wells Branch approaching Howard Lane intersection and close median opening between Howard and Loop 1 | ||||
65 | Wells Branch Pkwy Comprehensive Study | 2018 CO Program | Travis County | Program Management Consultant | Evaluate and improve safety, roadway geometrics and signal coordination and efficiency along Wells Banch Pkwy from IH35 to Loop 1 | ||||
66 | Bebee Road (East) | 2022 Bond Program | City of Kyle | Program and Project Controls | New location and reconstruction/widen roadway, 1.8 miles of 4-lane minor arterial from Dacy Ln to E. of Green Pastures Rd | ||||
67 | Bebee Road (West) | 2022 Bond Program | City of Kyle | Program and Project Controls | New location and reconstruction/widen roadway, 1 mile of 4-lane minor arterial from IH35 NBFR to Dacy Lane | ||||
68 | Bunton Creek Road | 2022 Bond Program | City of Kyle | Program and Project Controls | Reconstruction/widen existing roadway, 1.2 miles of 4 lane minor arterial from Lehman Rd to Porter Cove | ||||
69 | Center Street (FM 150) (On-System) | 2022 Bond Program | City of Kyle | Program and Project Controls | Reconstruction/widen existing roadway, 0.4 miles of 2-3 lane minor collector from Veterans Dr to Main St | ||||
70 | Kohlers to Seton (IH 35) | 2022 Bond Program | City of Kyle | Program and Project Controls | New location roadway, 0.13 miles of overpass or underpass from IH35 SBFR to NBFR | ||||
71 | Kohlers to Seton (off-system) | 2022 Bond Program | City of Kyle | Program and Project Controls | New location roadway, 1.07 miles of 4-lane minor arterial and 3-lane collector from IH 35 NBFR to Seton Pkwy | ||||
72 | Kyle Parkway/Lehman Road Extension | 2022 Bond Program | City of Kyle | Program and Project Controls | New location roadway, 1.3 miles of 4-lane minor arterial from Dacy Ln to Bunton Creek Rd | ||||
73 | Marketplace Avenue | 2022 Bond Program | City of Kyle | Program and Project Controls | New location and reconstruction/widen roadway, 0.6 miles of 4-lane minor arterial from FM 1626 to Marketplace Ave (Existing) | ||||
74 | Old Stagecoach Road/Center Street (Off-System) | 2022 Bond Program | City of Kyle | Program and Project Controls | Reconstruction/widen existing roadway, 2.2 miles of 4-lane minor arterial from FM 2770 to Veterans Dr | ||||
75 | Windy Hill Road | 2022 Bond Program | City of Kyle | Program and Project Controls | Reconstruction/widen existing roadway, 0.6 miles of 4 lane minor arterial Purple Martin Ave to IH 35 NBFR | ||||
76 | Development Process Change Management | Travis County | Development Services Improvement | Program and Project Controls | Help Travis County more quickly and effectively work through over 22,000 active permit applications with 250 – 700 new applications coming in each month. |