The Most Affordable Methods

The size, type of building, location, and cost of materials and labor impact the cost of building a school, but school districts have little or limited influence over many of these factors. To save money, responsible school districts are ensuring efficient and affordable construction through modular construction, value engineering, repurposing existing buildings, and design-build approach

Modular Construction

This modular construction method involves fabricating building components off-site and then assembling them on-site. 

Pros

  • Reduced construction time by fabricating components off-site
  • Reduce costs of on-site material storage and weather delays
  • Higher quality and consistency by fabricating in a controlled environment
  • Reduce overall waste

Cons

  • Limited design options
  • Potential zoning restrictions
  • Difficulty transporting the assembled components to the construction site 
  • Higher initial investment (long term savings)

Value Engineering

Value engineering involves a team of experts and stakeholders evaluating a project’s design, materials, and construction methods to identify opportunities for improvement and cost savings while maintaining or improving the desired quality and functionality of the project.

Pros

  • Reduced cost while maintaining desired quality and functionality
  • Lead to improvements in design, materials, and construction methods
  • Increased efficiency and reduced construction time
  • Better understanding of project needs

Cons

  • Time consuming process that can delay the construction start
  • Cost of conducting the value engineering analysis can be significant on large projects
  • Risk of compromise can result in less than desired quality and functionality

Repurposing Existing Buildings

Instead of building a new school from scratch, a district may choose to repurpose an existing building, such as a former office building or factory.

Pros

  • Saving on costs of land acquisition and new construction
  • Environmentally friendly by reducing waste and conserve resources
  • Historical preservation
  • Quicker completion time by not doing site preparation and new construction

Cons

  • Limited design options and flexibility for future changes
  • Significant upfront costs to update and retrofit the building
  • Unknown conditions and conditions lead to unplanned costs and delays

Design-Build Approach

A design-build approach involves hiring a single contractor to handle both the design and construction of the school.

Pros

  • Streamlined process by combining the design and construction into a single process
  • Single point of responsibility by hiring the same firm for the whole process
  • Improved collaboration between the design and construction teams
  • Cost savings through process optimization and waste reduction

Cons

  • Limited design options
  • Reduced control by the same firm being responsible for the entire process
  • Reduced competition
  • Higher risk to the project if the contractor cannot perform as expected

Ultimately, the most affordable method for building a school will depend on the specific needs and circumstances of the district, and it is important to consider a range of options and factors when making a decision.

At Front Line Advisory Group, we provide program management consulting services for capital improvement bonds. We are revolutionizing the construction industry and transforming client expectations by obsessing over the basics of budget oversight, schedule enforcement, compliance, vendor management, and stakeholder communication. Contact us for more info at info@frontlineadvisorygroup.com.

FLAG provides program management consulting services in Central Texas for municipal and school capital improvement bonds. FLAG is revolutionizing the construction industry and transforming client expectations by obsessing over the basics of budget oversight, schedule enforcement, compliance, vendor management, and stakeholder communication.

Join our weekly newsletter and receive a free copy of our new book!

JOIN NEWSLETTER

How Front Line Advisory Group Program-Level Controls Save Local Governments Money
Articles

How Front Line Advisory Group Program-Level Controls Save Local Governments Money

Executive Summary: Front Line Advisory Group (FLAG) applies disciplined program management to public capital projects, enabling local governments to avoid...
Read More
Why Texas Infrastructure Bond Votes Often Stumble
Articles

Why Texas Infrastructure Bond Votes Often Stumble

In cities and counties across Texas, local leaders are asking voters to approve billions in debt for roads, bridges, water...
Read More
Richardson’s $200 Million Vision: Building a More Resilient, Connected City
Articles

Richardson’s $200 Million Vision: Building a More Resilient, Connected City

The City of Richardson is preparing to launch an ambitious $200 million bond program anticipated for May 2026, representing a...
Read More
Building Beaumont’s Future: A $264 Million Bond to Strengthen Infrastructure, Safety, and Community Life
Articles

Building Beaumont’s Future: A $264 Million Bond to Strengthen Infrastructure, Safety, and Community Life

The City of Beaumont is preparing for a major investment in its future. On November 4, 2025, residents will vote...
Read More
Parker County’s $286 Million Bond Proposal: Investing in Justice, Safety, and Long-Term Growth
Articles

Parker County’s $286 Million Bond Proposal: Investing in Justice, Safety, and Long-Term Growth

Parker County, one of the fastest-growing regions in Texas, is preparing for a pivotal vote this November. On November 4,...
Read More
Billions on the Ballot: America’s Bond Boom and the Push for Accountability
Articles

Billions on the Ballot: America’s Bond Boom and the Push for Accountability

“Whenever the people are well informed, they can be trusted with their own government; … they may be relied on...
Read More
Hood County Weighs a $717 Million Road Program. The Real Work Starts Now.
Articles

Hood County Weighs a $717 Million Road Program. The Real Work Starts Now.

“Give me six hours to chop down a tree and I will spend the first four sharpening the axe.” —...
Read More
The Two Sides of the Scheduling Coin: Primavera P6 vs. Microsoft Project
Articles

The Two Sides of the Scheduling Coin: Primavera P6 vs. Microsoft Project

“Plans are nothing; planning is everything.” — Dwight D. Eisenhower   At a massive highway construction site in Texas, engineers...
Read More
Building Before the Boom
Articles

Building Before the Boom

“The time to repair the roof is when the sun is shining.” — John F. Kennedy Building Ahead of the...
Read More
AI and Standardization: Transforming Capital Bond Program Controls
Articles

AI and Standardization: Transforming Capital Bond Program Controls

AI and Standardization: Transforming Capital Bond Program Controls for Success and Trust Capital improvement bond programs are massive undertakings –...
Read More
1 2 3 25