NY Reconstruction Program $4.2B | 11,000+ projects
NY Storm Recovery $284M | 3,000+ projects
Travis County CIP 2011 $115M | 8 projects
Travis County CIP 2017 $307M | 58 projects
Travis County CIP 2023 $509M | 16 projects
City of Kyle CIP 2022 $294M | 9 projects
Williamson County CIP 2023 $825M | 38 projects
NO.
PROJECT NAME
FUNDING SOURCE
OWNER
COMPANY ROLE/RESPONSABILITY
PROJECT DESCRIPTION
1 East Wilco Hwy Segment 6 2023 Bond Program Williamson County Program and Project Controls Design and possible construction from SH 29 to US 971
2 East Wilco Hwy Segment 5 2023 Bond Program Williamson County Program and Project Controls Design and possible construction from Chandler Road to SH 29
3 East Wilco Hwy Segment 2 2023 Bond Program Williamson County Program and Project Controls Design and possible construction from CR 137 to CR 404
4 Corridor A2 Segment 2 2023 Bond Program Williamson County Program and Project Controls Construction services is a stand alone Task Order for Segment 2
5 Corridor A2 Segment 1 2023 Bond Program Williamson County Program and Project Controls Design and possible construction of Corridor A2, a new road between FM 973 and SH 95
6 Ronald Reagan Blvd WDN D2 2023 Bond Program Williamson County Program and Project Controls Design and possible construction from FM 3405 to West SH 95
7 Ronald Reagan Blvd WDN D1 2023 Bond Program Williamson County Program and Project Controls Design and possible construction from RM 2338 to SH 195
8 Ronald Reagan Blvd WDN C2 2023 Bond Program Williamson County Program and Project Controls Design and possible construction from CR 289 to RM 2338
9 Ronald Reagan Blvd WDN C1 2023 Bond Program Williamson County Program and Project Controls Design and possible construction from FM 3405 to CR 289
10 North Barker Street 2023 Bond Program Williamson County Program and Project Controls Design and possible construction of roadway and drainage improvements along North Barker Street in the City of Thrall
11 FM 971 (Granger) 2023 Bond Program Williamson County Program and Project Controls Design and possible widening of FM 971 near the future City of Granger High School
12 Salt Lake, Brook, Front Street 2023 Bond Program Williamson County Program and Project Controls Design and possible re‐construction of Salt Lake, Brook, and Front Street in the City of Bartlett
13 CR 305 2023 Bond Program Williamson County Program and Project Controls Design and possible re‐construction and widening of CR 305 from I‐35 to CR 307
14 Sonterra Boulevard 2023 Bond Program Williamson County Program and Project Controls Design and possible re‐construction of the intersection of Sonterra Boulevard with I‐35 NB Frontage Road in the City of Jarrell
15 CR 110 2023 Bond Program Williamson County Program and Project Controls Design and possible construction the extension of CR 110 North from CR 111 to Sam Houston Ave in Georgetown
16 Kenney Fort Boulevard 2023 Bond Program Williamson County Program and Project Controls Contribution to the City of Round Rock for the design and possible construction of the extension of Kenney Fort Boulevard from Old Settlers Boulevard to North of University Boulevard
17 Chandler Road 2023 Bond Program Williamson County Program and Project Controls Design and possible construction of improvements including an overpass at FM 1660
18 A/B East Wilco Highway 2023 Bond Program Williamson County Program and Project Controls Design and possible construction of various sections of East Wilco Highway between CR 137 south of Hutto and FM 971 east of Georgetown
19 CR 123 2023 Bond Program Williamson County Program and Project Controls Design and possible construction of a bridge over Brushy Creek on CR 123 to replace the low water crossing
20 Corridor A2 2023 Bond Program Williamson County Program and Project Controls Design and possible construction of Corridor A2, a new road between FM 973 and SH 95
21 CR 460 2023 Bond Program Williamson County Program and Project Controls Design and possible re‐construction and widening of CR 460 near the future City of Coupland High School
22 CR 458 2023 Bond Program Williamson County Program and Project Controls Design and possible re‐construction of CR 458 and other roadway improvements in the City of Coupland
23 Ronald Reagan Extension (I-35 to CR 145) 2023 Bond Program Williamson County Program and Project Controls Design and possible construction of a second frontage road on Ronald Reagan Boulevard from FM 3405 to Sun City Boulevard (at a minimum)
24 CR 138 2023 Bond Program Williamson County Program and Project Controls Design and possible construction of operational improvements on CR 138 from SH 130 NB Frontage Road to east of Derby Day Ave
25 West Main Street 2023 Bond Program Williamson County Program and Project Controls Design and possible re‐construction of West Main Street between South Patterson Ave and CR 226 in the City of Florence
26 SH 195 at Ronald Reagan Boulevard 2023 Bond Program Williamson County Program and Project Controls Design and possible construction of additional access ramps at SH 195 and Ronald Reagan Boulevard
27 Ronald Reagan Boulevard 2023 Bond Program Williamson County Program and Project Controls Design and possible construction of a second frontage road on Ronald Reagan Boulevard from FM 3405 to Sun City Boulevard (at a minimum)
28 FM 971 (Georgetown) 2023 Bond Program Williamson County Program and Project Controls Contribution to the City of Georgetown for the design and possible re‐ construction of FM 971 from Gann Street to SH 130
29 SE Inner Loop 2023 Bond Program Williamson County Program and Project Controls Contribution to the City of Georgetown for the design and possible re‐construction of the SE Inner Loop from FM 1460 to SH 29
30 I-35 at Inner Loop Interchange 2023 Bond Program Williamson County Program and Project Controls Design and possible construction of improvements to the intersection of SE Inner Loop and I‐35
31 Wyoming Springs Drive 2023 Bond Program Williamson County Program and Project Controls Design and possible construction of the extension of Wyoming Springs Drive from its current northern terminus to FM 1431
32 Toro Grande Boulevard 2023 Bond Program Williamson County Program and Project Controls Contribution to the City of Cedar Park for the design and construction of Toro Grande Boulevard from Parmer Lane to New Hope Drive
33 CR 214 2023 Bond Program Williamson County Program and Project Controls Design and possible construction of the extension of CR 214 north to bridge over the North Fork of the San Gabriel River and tie to US 183
34 CR 258 2023 Bond Program Williamson County Program and Project Controls Design and possible construction of improvements to CR 258 between Seward Junction Loop and CR 258 Extension
35 Seward Junction Loop 2023 Bond Program Williamson County Program and Project Controls Design and possible construction of the northern half of Seward Junction Loop from SH 29 near CR 213 to SH 29 near CR 260
36 Kauffman Loop 2023 Bond Program Williamson County Program and Project Controls Design and possible construction of the completion of the remaining SW section of Kauffman Loop from its current terminus to SH 29
37 B Liberty Hill Bypass East - Segment 3 2023 Bond Program Williamson County Program and Project Controls Design and possible construction of 2 lanes of the new Liberty Hill Bypass from Bagdad Road to SH 29
38 A Liberty Hill Bypass West - Segment 1 2023 Bond Program Williamson County Program and Project Controls Design and possible construction of 2 lanes of the new Liberty Hill Bypass from SH 29 (West of Liberty Hill High School) southeast to RM 1869
39 Bagdad Road 2023 Bond Program Williamson County Program and Project Controls Design and possible re‐construction and widening of North Bagdad Road from North of San Gabriel Parkway to CR 281
40 CR 175 2023 Bond Program Williamson County Program and Project Controls Re‐construction and widening of CR 175 from South of Creek Meadow Drive to RM 2243
41 Crystal Falls Parkway 2023 Bond Program Williamson County Program and Project Controls Design and possible construction of the extension of East Crystal Falls Parkway from Ronald Reagan Boulevard to CR 175
42 Rm 1431 at 183A Intersection 2023 Bond Program Williamson County Program and Project Controls Contribution to City of Cedar Park for design and construction of operational improvements at the intersection of 183A and RM 1431
43 Whitestone Boulevard 2023 Bond Program Williamson County Program and Project Controls Contribution to City of Cedar Park for widening of Whitestone Boulevard (RM 1431) from West of Anderson Mill Road to Bagdad Road
44 Eagles Nest Street 2023 Bond Program Williamson County Program and Project Controls Contribution to the City of Round Rock for design and possible construction of an extension of Eagles Nest Street from Chisholm Trail to Cypress Boulevard
45 Deepwood Drive 2023 Bond Program Williamson County Program and Project Controls Contribution to the City of Round Rock for design and possible construction of an extension of Deepwood Drive from RM 620 to Sam Bass Road
46 Red Bud Lane 2023 Bond Program Williamson County Program and Project Controls Design and possible re‐construction and widening of Red Bud Lane from Gattis School Road to Heatherwilde Boulevard
47 Schultz Lane 2023 Bond Program Williamson County Program and Project Controls Design and possible re‐construction and widening of Schultz Lane from Louis Henna Boulevard to New Meister Lane
48 Robinson Ranch Road 2023 Bond Program Williamson County Program and Project Controls Design and possible construction of 3 lanes of Robinson Ranch Road, a new north/south road connecting RM 620 at SH 45 to McNeil Rd
49 Parmer Lane at SH 45 2023 Bond Program Williamson County Program and Project Controls Design and construction of operational improvements at the intersection of Parmer Lane and SH 45
50 Development Process Change Management Travis County Development Services Improvement Program and Project Controls Help Travis County more quickly and effectively work through over 22,000 active permit applications with 250 – 700 new applications coming in each month.
51 Windy Hill Road 2022 Bond Program City of Kyle Program and Project Controls Reconstruction/widen existing roadway, 0.6 miles of 4 lane minor arterial Purple Martin Ave to IH 35 NBFR
52 Old Stagecoach Road/Center Street (Off-System) 2022 Bond Program City of Kyle Program and Project Controls Reconstruction/widen existing roadway, 2.2 miles of 4-lane minor arterial from FM 2770 to Veterans Dr
53 Marketplace Avenue 2022 Bond Program City of Kyle Program and Project Controls New location and reconstruction/widen roadway, 0.6 miles of 4-lane minor arterial from FM 1626 to Marketplace Ave (Existing)
54 Kyle Parkway/Lehman Road Extension 2022 Bond Program City of Kyle Program and Project Controls New location roadway, 1.3 miles of 4-lane minor arterial from Dacy Ln to Bunton Creek Rd
55 Kohlers to Seton (off-system) 2022 Bond Program City of Kyle Program and Project Controls New location roadway, 1.07 miles of 4-lane minor arterial and 3-lane collector from IH 35 NBFR to Seton Pkwy
56 Kohlers to Seton (IH 35) 2022 Bond Program City of Kyle Program and Project Controls New location roadway, 0.13 miles of overpass or underpass from IH35 SBFR to NBFR
57 Center Street (FM 150) (On-System) 2022 Bond Program City of Kyle Program and Project Controls Reconstruction/widen existing roadway, 0.4 miles of 2-3 lane minor collector from Veterans Dr to Main St
58 Bunton Creek Road 2022 Bond Program City of Kyle Program and Project Controls Reconstruction/widen existing roadway, 1.2 miles of 4 lane minor arterial from Lehman Rd to Porter Cove
59 Bebee Road (West) 2022 Bond Program City of Kyle Program and Project Controls New location and reconstruction/widen roadway, 1 mile of 4-lane minor arterial from IH35 NBFR to Dacy Lane
60 Bebee Road (East) 2022 Bond Program City of Kyle Program and Project Controls New location and reconstruction/widen roadway, 1.8 miles of 4-lane minor arterial from Dacy Ln to E. of Green Pastures Rd
61 Wells Branch Pkwy Comprehensive Study 2018 CO Program Travis County Program Management Consultant Evaluate and improve safety, roadway geometrics and signal coordination and efficiency along Wells Banch Pkwy from IH35 to Loop 1
62 Wells Branch Pkwy @ Howard Ln Median Modification 2018 CO Program Travis County Program Management Consultant Add and extend left turn lanes on Wells Branch approaching Howard Lane intersection and close median opening between Howard and Loop 1
63 Thomas Springs Rd at Circle Drive 2018 CO Program Travis County Program Management Consultant Add left turn lane on eastbound Circle Dr approaching Thomas Springs Rd
64 Thaxton Road 2018 CO Program Travis County Program Management Consultant Widen existing 2 lane roadway to a 4 lane roadway with bike lanes and sidewalks from, Mckny Falls Pky to Sassman Rd
65 Substandard Roads** 2018 CO Program Travis County Program Management Consultant Funding for cost-share agreements with subdivisions to improve unaccepted roadways to meet current county roadway standards
66 Ross Road South 2018 CO Program Travis County Program Management Consultant Widen the existing 2 lane roadway to a 4 lane divided roadway with bike lanes and sidewalks from Pearce Lane to Heine Farm Rd
67 Ross Rd North (High School) 2018 CO Program Travis County Program Management Consultant Add northbound auxiliary/right turn lane from St.Thomas to northern most driveway of Del Valle HS. Add Pedestrian Signal at second driveway.
68 Roadway Reconstruction 2018 CO Program Travis County Program Management Consultant Funding for various roadway reconstruction projects across the County
69 Pedernales Canyon Trail @ Lick Creek 2018 CO Program Travis County Program Management Consultant Drainage structure to replace undersized culverts
70 Pearce Ln @ Kellam Rd Intersection Improv. 2018 CO Program Travis County Program Management Consultant Add left turn lanes at approaches to intersection with Kellam Road and improve drainage structures for improved flow
71 Pearce Lane Widening [Eng / ROW] 2018 CO Program Travis County Program Management Consultant Engineering & ROW only for widening the existing 2 lane roadway to a 4 lane divided roadway with bike lanes and sidewalks from Kellam Rd to the Travis/Bastrop County Line.
72 Old Manor Rd Safety Improvements 2018 CO Program Travis County Program Management Consultant Improve the existing 2 lane roadway and add shoulders from Ferguson Cut-off Rd to Johnny Morris Rd and add left turn lanes at major intersections
73 Manda Carson Rd #134 2018 CO Program Travis County Program Management Consultant Rehab/replace bridge #134
74 Littig Rd #161 2018 CO Program Travis County Program Management Consultant Rehab/replace bridge #161
75 Linden Rd @ Maha Creek 2018 CO Program Travis County Program Management Consultant Replace undersized bridge and adjacent culverts
76 Ledgestone Terrace @ Pen Crk Tributary 2018 CO Program Travis County Program Management Consultant Drainage structure to replace undersized culvert
77 Jesse Bohls Realign** (0.5 mi in Pflugerville) [Eng / ROW] 2018 CO Program Travis County Program Management Consultant Engineering & ROW only for the realignment of Jesse Bohls at Weiss Lane to align with E. Pflugerville Pkwy as a 2 lane Roadway with shoulders from Weiss lane to approximately 1 mile east then continue with added shoulders out to Cameron Rd and new alignment approaching Cameron Rd.
78 Hog Eye Rd @ trib to Harris Branch - Lockwood Watershed 2018 CO Program Travis County Program Management Consultant Drainage structure to replace undersized culvert
79 Hog Eye Rd @ Harris Branch - Lockwood Watershed 2018 CO Program Travis County Program Management Consultant Drainage structure to replace undersized culverts
80 Hamilton Pool Road Phase 2 2018 CO Program Travis County Program Management Consultant Phase II - Safety Improvements along Hamilton Pool Road; Addition of shoulders, turn lanes, and increasing curve radii from 1.7 Miles East of Pedernales River to East of High Plains Drive.
81 Hamilton Pool Road (acute) 2018 CO Program Travis County Program Management Consultant Concentrated safety improvements to include adding left turn lanes at 4 locations, 3 culvert extensions, shoulder improvements at 6 curves, a 3,000 foot passing lane, and one intersection alignment improvement from RM12 to the Pedernales River
82 Great Divide @ Little Barton Creek [Eng Only] 2018 CO Program Travis County Program Management Consultant Engineering Design for bridge to replace undersized culverts
83 Elroy Road Widening 2018 CO Program Travis County Program Management Consultant Widen the existing 2 lane roadway to a 4 lane divided roadway with bike lanes and sidewalks from McAngus Rd to Kellam Rd and bring the roadway out of the 100 year flood plain.
84 County Line Rd @ Elm Creek 2018 CO Program Travis County Program Management Consultant Drainage structure to replace undersized culverts
85 Caldwell Ln @ River Timber Dr 2018 CO Program Travis County Program Management Consultant Place drainage structure at low point in road
86 Arroyo Doble/Twin Creeks 2018 CO Program Travis County Program Management Consultant Construct subdivision drainage improvements as identified in the 2009 Drainage Basin Study, and make drainage improvements to the adjacent Bethel Church Road, Polk Road, and Wirth Road. Design funds approved in FY17 CO's
87 Hodde Lane Roadway Realignment 2017 CO Program Travis County Program Management Consultant Realign S-Curve near Mott Elementary School
88 Wyldwood Road @ Slaughter Creek and tributary 2017 Bond Program Travis County Program Management Consultant Bridges to replace undersized culverts
89 William Cannon Extension 2017 Bond Program Travis County Program Management Consultant Engineering and ROW acquisition for a new 4 lane divided roadway with shoulders from US 183 at William Cannon to FM973
90 Westminster Glen Sidewalk 2017 Bond Program Travis County Program Management Consultant City Park Road to Narrow Ridge, construct sidewalk
91 TxDOT Right-of-Way 2017 Bond Program Travis County Program Management Consultant Right-of-way for State road projects
92 Tumbleweed Trail @ Trib to Lake Austin 2017 Bond Program Travis County Program Management Consultant Drainage structure to replace undersized culvert
93 Tom Sassman Rd @ Maha Ck 2017 Bond Program Travis County Program Management Consultant Bridge to replace undersized culverts
94 Strategic Parkland Acquisitions 2017 Bond Program Travis County Program Management Consultant Acquire land or interest in land in the Pedernales River watershed to improve the boundary configuration of an existing park
95 Springdale Road Sidewalk 2017 Bond Program Travis County Program Management Consultant Ferguson Ln to US Hwy 290, construct sidewalk
96 Spicewood Springs Rd Low Water Crossing #1 Only 2017 Bond Program Travis County Program Management Consultant Bridge to replace undersized box culvert
97 South Pleasant Valley Road 2017 Bond Program Travis County Program Management Consultant Construct new 4 lane divided roadway with bike lanes and sidewalks from FM 1327 to Bradshaw Road approximately 1,000' south of River Plantation Drive
98 Sidewalk Safety & ADA Upgrades 2017 Bond Program Travis County Program Management Consultant Construct New/Reconstruct non-compliant sidewalks
99 Onion Creek Greenway Improvements 2017 Bond Program Travis County Program Management Consultant Construct trailhead park at the US 183 and Onion Creek park site and build a hiking, biking, and walking trail to Barkley Meadows; construct restrooms, water and waste water services, and a loop trail around Barkley Meadows
100 Old San Antonio Road 2017 Bond Program Travis County Program Management Consultant Austin City Limit to Hays County Line, add bike lanes
101 Old Lockhart Road 2017 Bond Program Travis County Program Management Consultant Slaughter Lane to Thaxton Road, add bike lanes
102 Northeast Metro Park Soccer Field Improvements 2017 Bond Program Travis County Program Management Consultant Convert four (4) soccer fields to synthetic turf, install sports lighting, and build associated improvements
103 North Walnut Creek Ph IIIB 2017 Bond Program Travis County Program Management Consultant Sprinkle Road to Old Manor Road, engineering and right-of-way only for shared use path
104 Harold Green Extension 2017 Bond Program Travis County Program Management Consultant Construct new 2 lane roadway with bike lanes and sidewalks from SH130 to Austins Colony Blvd
105 Gregg Lane @ Wilbarger Ck 2017 Bond Program Travis County Program Management Consultant Replace undersized culvert
106 Great Divide @ Little Barton Creek (Construction Only) 2017 Bond Program Travis County Program Management Consultant Bridge to replace undersized culverts
107 Grand Avenue Parkway 2017 Bond Program Travis County Program Management Consultant Construct new 4 lane divided roadway with bike lanes and sidewalks from Bratton Lane to Crissom Lane and add two additional lanes from Crissom Lane to 350' north of Roller Crossing
108 Gilleland Creek Greenway Parkland Acquisition 2017 Bond Program Travis County Program Management Consultant Acquire parkland for a 19-mile Gilleland Creek greenway between Northeast Metro Park and the Colorado River
109 Gilleland Creek Greenway improvements 2017 Bond Program Travis County Program Management Consultant Plan, design, and engineer the 19-mile greenway between Northeast Metro Park and the Colorado River
110 FM 973 2017 Bond Program Travis County Program Management Consultant Moore's Bridge Road to Elroy Road, add a shared use path
111 Fitzhugh Road 2017 Bond Program Travis County Program Management Consultant US 290 W to Travis County Line, add bike lanes
112 Elroy Road 2017 Bond Program Travis County Program Management Consultant Within the right-of-way of SH130, to add sidewalk
113 Ed Acklin Rd @ unnamed trib to Dry Creek 2017 Bond Program Travis County Program Management Consultant Drainage structures to replace undersized culverts
114 Eastern Travis County Parkland Acquisition 2017 Bond Program Travis County Program Management Consultant Acquire parkland for the greenways, Colorado River corridor parks, and parks in the Post Oak Savanna region
115 Decker Lane/ Hog Eye Road Sidewalk 2017 Bond Program Travis County Program Management Consultant Decker Lake Road to Hog Eye Road then Decker Lane to community First Village, construct sidewalk
116 Conservation Easements 2017 Bond Program Travis County Program Management Consultant Execute conservation agreements to protect water resources, working farms and ranches, wildlife habitat, critical environmental features, and other natural and cultural resources
117 Circle Drive/Thomas Springs 2017 Bond Program Travis County Program Management Consultant SH 71 to US 290 W, add bike lanes
118 Bullick Hollow Road @ FM2769 Intersection Improvements 2017 Bond Program Travis County Program Management Consultant Add right turm lane on west bound Bullick Hollow Road at FM2769
119 Bitting School Rd @ unamed trib to Wilbarger Creek 2017 Bond Program Travis County Program Management Consultant Drainage structure to replace existing culverts
120 Bee Creek Sports Complex Development 2017 Bond Program Travis County Program Management Consultant Build a sports complex with synthetic turf fields, sports lighting, hiking, biking, and walking trail, picnic areas, playgrounds, and other site improvements.
121 Arkansas Bend Park Phase II 2017 Bond Program Travis County Program Management Consultant Construct overnight facilities and associated site improvements
122 Taylor Lane (Construction) 2011 Bond Program Travis County Project Rescue and Completion Widen 2-lane road to 4-lane arterial from Braker Lane extension to Blake Manor Road
123 E. William Cannon Drive - Phase 3 2011 Bond Program Travis County Project Rescue and Completion New 4-lane arterial from McKinney Falls Parkway to US 183 -Broken down into Three Phase- Phase 1 and phase 2 construction complete
124 Cameron Rd (Construction) 2011 Bond Program Travis County Project Rescue and Completion Widen and realign the existing 2-lane road to a 4-lane divided arterial with bike lanes and sidewalks from Gregg Lane to SH 130.
125 Blake Manor Road 2011 Bond Program Travis County Project Rescue and Completion Widen Blake Manor Rd from 2-lane to 4-lane from Taylor Lane to the proposed Wildhorse Connector (close to the Manor City Limits)
NY Reconstruction Program $4.2B | 11,000+ projects
NY Storm Recovery $284M | 3,000+ projects
Travis County CIP 2011 $115M | 8 projects
Travis County CIP 2017 $307M | 58 projects
Travis County CIP 2023 $509M | 16 projects
City of Kyle CIP 2022 $294M | 9 projects
Williamson County CIP 2023 $825M | 38 projects
1 Development Process Change Management Travis County Development Services Improvement Program and Project Controls Help Travis County more quickly and effectively work through over 22,000 active permit applications with 250 – 700 new applications coming in each month.
2 Windy Hill Road 2022 Bond Program City of Kyle Program and Project Controls Reconstruction/widen existing roadway, 0.6 miles of 4 lane minor arterial Purple Martin Ave to IH 35 NBFR
3 Old Stagecoach Road/Center Street (Off-System) 2022 Bond Program City of Kyle Program and Project Controls Reconstruction/widen existing roadway, 2.2 miles of 4-lane minor arterial from FM 2770 to Veterans Dr
4 Marketplace Avenue 2022 Bond Program City of Kyle Program and Project Controls New location and reconstruction/widen roadway, 0.6 miles of 4-lane minor arterial from FM 1626 to Marketplace Ave (Existing)
5 Kyle Parkway/Lehman Road Extension 2022 Bond Program City of Kyle Program and Project Controls New location roadway, 1.3 miles of 4-lane minor arterial from Dacy Ln to Bunton Creek Rd
6 Kohlers to Seton (off-system) 2022 Bond Program City of Kyle Program and Project Controls New location roadway, 1.07 miles of 4-lane minor arterial and 3-lane collector from IH 35 NBFR to Seton Pkwy
7 Kohlers to Seton (IH 35) 2022 Bond Program City of Kyle Program and Project Controls New location roadway, 0.13 miles of overpass or underpass from IH35 SBFR to NBFR
8 Center Street (FM 150) (On-System) 2022 Bond Program City of Kyle Program and Project Controls Reconstruction/widen existing roadway, 0.4 miles of 2-3 lane minor collector from Veterans Dr to Main St
9 Bunton Creek Road 2022 Bond Program City of Kyle Program and Project Controls Reconstruction/widen existing roadway, 1.2 miles of 4 lane minor arterial from Lehman Rd to Porter Cove
10 Bebee Road (West) 2022 Bond Program City of Kyle Program and Project Controls New location and reconstruction/widen roadway, 1 mile of 4-lane minor arterial from IH35 NBFR to Dacy Lane
11 Bebee Road (East) 2022 Bond Program City of Kyle Program and Project Controls New location and reconstruction/widen roadway, 1.8 miles of 4-lane minor arterial from Dacy Ln to E. of Green Pastures Rd
12 Wells Branch Pkwy Comprehensive Study 2018 CO Program Travis County Program Management Consultant Evaluate and improve safety, roadway geometrics and signal coordination and efficiency along Wells Banch Pkwy from IH35 to Loop 1
13 Wells Branch Pkwy @ Howard Ln Median Modification 2018 CO Program Travis County Program Management Consultant Add and extend left turn lanes on Wells Branch approaching Howard Lane intersection and close median opening between Howard and Loop 1
14 Thomas Springs Rd at Circle Drive 2018 CO Program Travis County Program Management Consultant Add left turn lane on eastbound Circle Dr approaching Thomas Springs Rd
15 Thaxton Road 2018 CO Program Travis County Program Management Consultant Widen existing 2 lane roadway to a 4 lane roadway with bike lanes and sidewalks from, Mckny Falls Pky to Sassman Rd
16 Substandard Roads** 2018 CO Program Travis County Program Management Consultant Funding for cost-share agreements with subdivisions to improve unaccepted roadways to meet current county roadway standards
17 Ross Road South 2018 CO Program Travis County Program Management Consultant Widen the existing 2 lane roadway to a 4 lane divided roadway with bike lanes and sidewalks from Pearce Lane to Heine Farm Rd
18 Ross Rd North (High School) 2018 CO Program Travis County Program Management Consultant Add northbound auxiliary/right turn lane from St.Thomas to northern most driveway of Del Valle HS. Add Pedestrian Signal at second driveway.
19 Roadway Reconstruction 2018 CO Program Travis County Program Management Consultant Funding for various roadway reconstruction projects across the County
20 Pedernales Canyon Trail @ Lick Creek 2018 CO Program Travis County Program Management Consultant Drainage structure to replace undersized culverts
21 Pearce Ln @ Kellam Rd Intersection Improv. 2018 CO Program Travis County Program Management Consultant Add left turn lanes at approaches to intersection with Kellam Road and improve drainage structures for improved flow
22 Pearce Lane Widening [Eng / ROW] 2018 CO Program Travis County Program Management Consultant Engineering & ROW only for widening the existing 2 lane roadway to a 4 lane divided roadway with bike lanes and sidewalks from Kellam Rd to the Travis/Bastrop County Line.
23 Old Manor Rd Safety Improvements 2018 CO Program Travis County Program Management Consultant Improve the existing 2 lane roadway and add shoulders from Ferguson Cut-off Rd to Johnny Morris Rd and add left turn lanes at major intersections
24 Manda Carson Rd #134 2018 CO Program Travis County Program Management Consultant Rehab/replace bridge #134
25 Littig Rd #161 2018 CO Program Travis County Program Management Consultant Rehab/replace bridge #161
26 Linden Rd @ Maha Creek 2018 CO Program Travis County Program Management Consultant Replace undersized bridge and adjacent culverts
27 Ledgestone Terrace @ Pen Crk Tributary 2018 CO Program Travis County Program Management Consultant Drainage structure to replace undersized culvert
28 Jesse Bohls Realign** (0.5 mi in Pflugerville) [Eng / ROW] 2018 CO Program Travis County Program Management Consultant Engineering & ROW only for the realignment of Jesse Bohls at Weiss Lane to align with E. Pflugerville Pkwy as a 2 lane Roadway with shoulders from Weiss lane to approximately 1 mile east then continue with added shoulders out to Cameron Rd and new alignment approaching Cameron Rd.
29 Hog Eye Rd @ trib to Harris Branch - Lockwood Watershed 2018 CO Program Travis County Program Management Consultant Drainage structure to replace undersized culvert
30 Hog Eye Rd @ Harris Branch - Lockwood Watershed 2018 CO Program Travis County Program Management Consultant Drainage structure to replace undersized culverts
31 Hamilton Pool Road Phase 2 2018 CO Program Travis County Program Management Consultant Phase II - Safety Improvements along Hamilton Pool Road; Addition of shoulders, turn lanes, and increasing curve radii from 1.7 Miles East of Pedernales River to East of High Plains Drive.
32 Hamilton Pool Road (acute) 2018 CO Program Travis County Program Management Consultant Concentrated safety improvements to include adding left turn lanes at 4 locations, 3 culvert extensions, shoulder improvements at 6 curves, a 3,000 foot passing lane, and one intersection alignment improvement from RM12 to the Pedernales River
33 Great Divide @ Little Barton Creek [Eng Only] 2018 CO Program Travis County Program Management Consultant Engineering Design for bridge to replace undersized culverts
34 Elroy Road Widening 2018 CO Program Travis County Program Management Consultant Widen the existing 2 lane roadway to a 4 lane divided roadway with bike lanes and sidewalks from McAngus Rd to Kellam Rd and bring the roadway out of the 100 year flood plain.
35 County Line Rd @ Elm Creek 2018 CO Program Travis County Program Management Consultant Drainage structure to replace undersized culverts
36 Caldwell Ln @ River Timber Dr 2018 CO Program Travis County Program Management Consultant Place drainage structure at low point in road
37 Arroyo Doble/Twin Creeks 2018 CO Program Travis County Program Management Consultant Construct subdivision drainage improvements as identified in the 2009 Drainage Basin Study, and make drainage improvements to the adjacent Bethel Church Road, Polk Road, and Wirth Road. Design funds approved in FY17 CO's
38 Hodde Lane Roadway Realignment 2017 CO Program Travis County Program Management Consultant Realign S-Curve near Mott Elementary School
39 Wyldwood Road @ Slaughter Creek and tributary 2017 Bond Program Travis County Program Management Consultant Bridges to replace undersized culverts
40 William Cannon Extension 2017 Bond Program Travis County Program Management Consultant Engineering and ROW acquisition for a new 4 lane divided roadway with shoulders from US 183 at William Cannon to FM973
41 Westminster Glen Sidewalk 2017 Bond Program Travis County Program Management Consultant City Park Road to Narrow Ridge, construct sidewalk
42 TxDOT Right-of-Way 2017 Bond Program Travis County Program Management Consultant Right-of-way for State road projects
43 Tumbleweed Trail @ Trib to Lake Austin 2017 Bond Program Travis County Program Management Consultant Drainage structure to replace undersized culvert
44 Tom Sassman Rd @ Maha Ck 2017 Bond Program Travis County Program Management Consultant Bridge to replace undersized culverts
45 Strategic Parkland Acquisitions 2017 Bond Program Travis County Program Management Consultant Acquire land or interest in land in the Pedernales River watershed to improve the boundary configuration of an existing park
46 Springdale Road Sidewalk 2017 Bond Program Travis County Program Management Consultant Ferguson Ln to US Hwy 290, construct sidewalk
47 Spicewood Springs Rd Low Water Crossing #1 Only 2017 Bond Program Travis County Program Management Consultant Bridge to replace undersized box culvert
48 South Pleasant Valley Road 2017 Bond Program Travis County Program Management Consultant Construct new 4 lane divided roadway with bike lanes and sidewalks from FM 1327 to Bradshaw Road approximately 1,000' south of River Plantation Drive
49 Sidewalk Safety & ADA Upgrades 2017 Bond Program Travis County Program Management Consultant Construct New/Reconstruct non-compliant sidewalks
50 Onion Creek Greenway Improvements 2017 Bond Program Travis County Program Management Consultant Construct trailhead park at the US 183 and Onion Creek park site and build a hiking, biking, and walking trail to Barkley Meadows; construct restrooms, water and waste water services, and a loop trail around Barkley Meadows
51 Old San Antonio Road 2017 Bond Program Travis County Program Management Consultant Austin City Limit to Hays County Line, add bike lanes
52 Old Lockhart Road 2017 Bond Program Travis County Program Management Consultant Slaughter Lane to Thaxton Road, add bike lanes
53 Northeast Metro Park Soccer Field Improvements 2017 Bond Program Travis County Program Management Consultant Convert four (4) soccer fields to synthetic turf, install sports lighting, and build associated improvements
54 North Walnut Creek Ph IIIB 2017 Bond Program Travis County Program Management Consultant Sprinkle Road to Old Manor Road, engineering and right-of-way only for shared use path
55 Harold Green Extension 2017 Bond Program Travis County Program Management Consultant Construct new 2 lane roadway with bike lanes and sidewalks from SH130 to Austins Colony Blvd
56 Gregg Lane @ Wilbarger Ck 2017 Bond Program Travis County Program Management Consultant Replace undersized culvert
57 Great Divide @ Little Barton Creek (Construction Only) 2017 Bond Program Travis County Program Management Consultant Bridge to replace undersized culverts
58 Grand Avenue Parkway 2017 Bond Program Travis County Program Management Consultant Construct new 4 lane divided roadway with bike lanes and sidewalks from Bratton Lane to Crissom Lane and add two additional lanes from Crissom Lane to 350' north of Roller Crossing
59 Gilleland Creek Greenway Parkland Acquisition 2017 Bond Program Travis County Program Management Consultant Acquire parkland for a 19-mile Gilleland Creek greenway between Northeast Metro Park and the Colorado River
60 Gilleland Creek Greenway improvements 2017 Bond Program Travis County Program Management Consultant Plan, design, and engineer the 19-mile greenway between Northeast Metro Park and the Colorado River
61 FM 973 2017 Bond Program Travis County Program Management Consultant Moore's Bridge Road to Elroy Road, add a shared use path
62 Fitzhugh Road 2017 Bond Program Travis County Program Management Consultant US 290 W to Travis County Line, add bike lanes
63 Elroy Road 2017 Bond Program Travis County Program Management Consultant Within the right-of-way of SH130, to add sidewalk
64 Ed Acklin Rd @ unnamed trib to Dry Creek 2017 Bond Program Travis County Program Management Consultant Drainage structures to replace undersized culverts
65 Eastern Travis County Parkland Acquisition 2017 Bond Program Travis County Program Management Consultant Acquire parkland for the greenways, Colorado River corridor parks, and parks in the Post Oak Savanna region
66 Decker Lane/ Hog Eye Road Sidewalk 2017 Bond Program Travis County Program Management Consultant Decker Lake Road to Hog Eye Road then Decker Lane to community First Village, construct sidewalk
67 Conservation Easements 2017 Bond Program Travis County Program Management Consultant Execute conservation agreements to protect water resources, working farms and ranches, wildlife habitat, critical environmental features, and other natural and cultural resources
68 Circle Drive/Thomas Springs 2017 Bond Program Travis County Program Management Consultant SH 71 to US 290 W, add bike lanes
69 Bullick Hollow Road @ FM2769 Intersection Improvements 2017 Bond Program Travis County Program Management Consultant Add right turm lane on west bound Bullick Hollow Road at FM2769
70 Bitting School Rd @ unamed trib to Wilbarger Creek 2017 Bond Program Travis County Program Management Consultant Drainage structure to replace existing culverts
71 Bee Creek Sports Complex Development 2017 Bond Program Travis County Program Management Consultant Build a sports complex with synthetic turf fields, sports lighting, hiking, biking, and walking trail, picnic areas, playgrounds, and other site improvements.
72 Arkansas Bend Park Phase II 2017 Bond Program Travis County Program Management Consultant Construct overnight facilities and associated site improvements
73 Taylor Lane (Construction) 2011 Bond Program Travis County Project Rescue and Completion Widen 2-lane road to 4-lane arterial from Braker Lane extension to Blake Manor Road
74 E. William Cannon Drive - Phase 3 2011 Bond Program Travis County Project Rescue and Completion New 4-lane arterial from McKinney Falls Parkway to US 183 -Broken down into Three Phase- Phase 1 and phase 2 construction complete
75 Cameron Rd (Construction) 2011 Bond Program Travis County Project Rescue and Completion Widen and realign the existing 2-lane road to a 4-lane divided arterial with bike lanes and sidewalks from Gregg Lane to SH 130.
76 Blake Manor Road 2011 Bond Program Travis County Project Rescue and Completion Widen Blake Manor Rd from 2-lane to 4-lane from Taylor Lane to the proposed Wildhorse Connector (close to the Manor City Limits)